PRODUCTION

 

In Enge-Sande in Nordfriesland, not far from the Danish border, the head office of Wind Technik Nord GmbH is situated.

In the neighbour village, beside the building of an old wind mill from last century, are on an area of about 1500 m² workshop for the electrical and mechanical production. A modern 350 m² crane bay with 12,5 tons crane as assembly shop for the nacelle was completed in 1996.

All internal procedures are supported by a flexible computer network, also construction and design work is carried out by means of a modern CAD-system.

The remote control system of the wind energy converters is centralised in the office in Enge-Sande. All messages of failures are monitored on a PC or printer. So long failure times are avoided and a high availability of the plants are guaranteed. Regular maintenance through service engineers guarantees a safe operation, high energy output and a long operating life.